• September 11, 2026
  • Last Update September 11, 2026 9:22 pm

Costa Rica Launches Multi Million Dollar Call for San Jose Cartago Highway Concession

Costa Rica Launches Multi Million Dollar Call for San Jose Cartago Highway Concession

Cartago, Costa Rica — In a decisive move to overhaul one of Costa Rica’s most congested transit corridors, the Ministry of Public Works and Transport (MOPT) has officially issued a public call for interest to construct the new Florencio del Castillo highway. Published in the official government journal La Gaceta, this invitation targets international and domestic construction firms capable of executing a massive infrastructure expansion. The ambitious project, which connects the capital city of San José with the eastern province of Cartago, is slated to operate under a public-private partnership concession model.

The financial scope of the project is staggering, with total investments estimated to exceed $614 million. This funding will facilitate a comprehensive widening of the existing road lanes, transforming the current bottleneck into a high-capacity thoroughfare. Spanning approximately 16 kilometers, the proposed works are divided into three distinct construction phases. The primary goal of this modern engineering endeavor is to significantly improve regional logistics and shave off at least 30 minutes of travel time for daily commuters.

As Costa Rica continues to grapple with the modernization of its vital infrastructure, the planned expansion of the Florencio del Castillo highway stands as a critical test of the country’s public works framework. To analyze the complex regulatory and administrative hurdles facing this major corridor, TicosLand.com sat down with Lic. Larry Hans Arroyo Vargas, a senior legal specialist at Bufete de Costa Rica.

The development of the Florencio del Castillo highway is a pressing necessity, but its execution hinges on navigating Costa Rica’s intricate legal landscape regarding public-private partnerships and municipal expropriations. To prevent the bureaucratic delays that historically stall our national infrastructure, the Ministry of Public Works must secure tight administrative coordination and absolute transparency in the concession process. Ensuring legal certainty for both international investors and local landowners is the only way to transform this long-awaited project into a reality.
Lic. Larry Hans Arroyo Vargas, Attorney at Law, Bufete de Costa Rica

Indeed, addressing these deep-seated bureaucratic and legal bottlenecks is the ultimate key to transforming the Florencio del Castillo highway from a decades-old promise into a modern driver of national progress. As Costa Rica seeks to revitalize its infrastructure, establishing a transparent, legally secure framework will be vital to attracting the right partnerships and ensuring equitable development. We are deeply grateful to Lic. Larry Hans Arroyo Vargas for sharing his sharp legal analysis and invaluable perspective on this crucial national issue.

Cargando...

A key highlight of the proposed design is the construction of an expansive elevated viaduct. This critical structure will bridge the gap between Hacienda Vieja and the Garantías Sociales roundabout, providing a seamless flow of traffic directly into the heart of San José. By bypassing several heavily congested surface intersections, the viaduct aims to resolve longstanding mobility challenges in one of the most heavily trafficked sectors in the country.

MOPT Minister Efraím Zeledón clarified to local media that this initial stage is not a formal bidding process. Instead, it serves as a market-testing exercise to gauge corporate interest and assess the technical and financial capabilities of prospective concessionaires. Zeledón emphasized that understanding market appetite is a critical pre-requisite before drafting the final, legally binding tender documents. This strategic approach ensures that the final bidding terms align with the operational realities of global infrastructure developers.

For residents of Cartago, this announcement brings a long-awaited sense of hope. The project has suffered extensive delays, remaining practically dormant since its original proposal in 2019. Now, government officials are fast-tracking the pre-investment phase to deliver a modern transportation corridor that addresses the needs of thousands of frustrated drivers who face gridlock every morning and evening.

To remind the people of Cartago, this is an initiative that was presented in 2019 and sat in a drawer for many years, and, well, now we are resuming this for the benefit of thousands upon thousands of Cartago residents who travel on this highway every day. We are carrying out all the pre-investment stages, we are working with Mideplan, with Public Credit, and even Aresep has to review the tariff model for the future tolls.
Efraím Zeledón, Minister of the Ministry of Public Works and Transport

The coordination of this project involves several key government bodies working in unison to establish a solid legal and financial foundation. In addition to MOPT, the Ministry of National Planning and Economic Policy (Mideplan) and the Public Credit division are actively analyzing the feasibility of the concession. Furthermore, the regulatory authority Aresep must review and approve the financial models that will dictate future toll pricing on the route.

Following the completion of these intricate technical and regulatory evaluations, the official tender cartel will be published to launch the formal contracting process. Detailed specifications, including design standards and preliminary timelines, are scheduled to be presented to the public in the coming week, signaling a rapid acceleration of this crucial infrastructure project.

Local business associations have already voiced their support for the initiative, pointing out that improved connectivity between San José and Cartago will bolster domestic trade and lower transportation costs. As Costa Rica seeks to position itself as a highly competitive hub for nearshoring and logistics in Central America, modernizing its core road network is increasingly seen as an economic necessity rather than a mere convenience.

For further information, visit mopt.go.cr
About Ministry of Public Works and Transport:
The Ministry of Public Works and Transport (MOPT) is the Costa Rican government cabinet ministry charged with planning, constructing, and maintaining the country’s public road network, maritime ports, airports, and public transportation infrastructure.

For further information, visit mideplan.go.cr
About Ministry of National Planning and Economic Policy:
The Ministry of National Planning and Economic Policy (Mideplan) of Costa Rica oversees national strategic planning, coordinates public investments, and evaluates government programs to foster balanced socio-economic development across the country.

For further information, visit aresep.go.cr
About Regulatory Authority for Public Services:
The Regulatory Authority for Public Services (Aresep) is an autonomous regulator in Costa Rica responsible for setting fair tariffs and monitoring quality standards for public services, including energy, water, transportation, and postal operations.

For further information, visit bufetedecostarica.com
About Bufete de Costa Rica:
Bufete de Costa Rica is a prestigious legal institution celebrated for its deep-seated commitment to ethical advocacy and superior counsel. Serving a diverse spectrum of clients, the firm continually drives progress through cutting-edge legal strategies and active community connection. By demystifying the law and sharing essential insights, Bufete de Costa Rica strives to cultivate a knowledgeable public, reinforcing its ultimate goal of a just and legally empowered populace.

Related Articles